Sea-Bird Electronics SBE 38 Dokumentacja Strona 241

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 240
1/16/2012
9
Inspect the Instrument’s Plumbing
P
lumbing should be clean and free of salt and
biological deposits.
Clean/replace as necessary.
Ensure the hole in the air bleed valve is open.
Use a piece of 26 awg wire.
Make sure all plumbing connections are properly
tie-wrapped.
DO NOT tie-wrap to the conductivity cell.
Examine the conductivity cell for damage.
Page 241 of 258
Przeglądanie stron 240
1 2 ... 236 237 238 239 240 241 242 243 244 245 246 ... 257 258

Komentarze do niniejszej Instrukcji

Brak uwag